The trim has been painted and the roof is shingled.
The installation was put in, and the drywall was dropped off.

The arches have been framed.

Good news! Since our closet in the master was messed up... they compensated us by getting us these corbels (The arches shown below attached to the pillars) and they will be installing 5 additional shelves in the master closet. Dave was meeting with a closet planner today to figure out how to best utilize the closet space.

The drywall hang inspection will be on Thursday. And it should be finished by July 24th.